Providence Gas Co.-AA (a.k.a. Former New England Gas Company MGP) 642 Allens Avenue, Providence, Rhode Island This Document Index was established in September 2016. As such, many older documents related to this site are currently only available in hard copy, and are not found on this page. If you wish to complete a review of all documents related to this site, please request a file review with RIDEM's Office of Customer and Technical Assistance. Instructions on how to file such a request can be found here. Document Description Date HEI - Underground Storage Tank Closure Assessment 10/xx/1995 RCA - Remedial Action Report for Condensate Tank Closure - Compressor Building No. 2 10/20/1995 RCA - Remedial Action Report for Short Term Measure 6/14/1996 HEI - Underground Storage Tank Closure Assessment 9/xx/1998 ESS - Subsurface Investigation and Proposed Remediation 10/21/1999 Prov Gas Co. - Summary Letter 4/13/2001 VHB - Remdial Action Closure Report 11/15/2002 VHB - Remdial Action Closure Report 12/xx/2002 VHB - Site Investigation Report 4/8/2003 GZA - Short Term Response Action Plan (STRAP) - Holder 18-21 Capping Project 4/27/2016 GZA - Short Term Response Action Plan (STRAP) Addendum - Holder 18-21 Capping Project 5/10/2016 RIDEM - SHort Term Response Action Approval Letter - Holder 18-21 Capping Project 5/18/2016 GZA - Proposed Upcoming Groundwater Monitoring Activities 5/26/2016 GZA - Short Term Response Action Plan (STRAP) - Dike Access Road 6/29/2016 GZA - SHort Term Response Action Plan (STRAP) Addendum - Dike Access Road 8/22/2016 RIDEM - SHort Term Response Action Approval Letter - Dike Access Road Project 8/25/2016 RIDEM - Office of Water Resources Approval Letter - Dike Access Road Project 8/29/2016 RIDEM - Public Involvement Plan Process Inititation Letter with attached PIP Petition 9/6/2016 GZA - Proposed Schedule for the PIP Development Process 9/15/2016 Hinckley Allen - Legal Memorandum - Liquefaction Project 9/26/2016 GZA - Updated Schedule - Draft PIP Development Process 9/30/2016 RIDEM - RIDEM Legal Response to Hinckley Allen Liquifaction Memo & PIP 10/21/2016 GZA - Draft Public Involvement Plan with attachments 10/28/2016 No LNG in PVD - Open Letter to RIDEM about National Grid's proposed Fields Point Liquefaction Facility 11/1/2016 Alston & Bird LLP - Letter to FERC - Supplemental Information related to Liquefaction Project Resource Report 7 and the Soil Management Plan 11/16/2016 RIDEM - Office of Customer & Technical Assistance - Meeting Summary Letter 1/10/2017 FERC - Letter to RIDEM regarding 10-21-16 Letter fron RIDEM to National Grid 1/17/17 No LNG in PVD - Federal Consistency Review Comments to RICRMC 1/23/17 No LNG in PVD - Follow up Letter to RIDEM 2/10/17 FERC - Environmental Data Request Letter to National Grid 4/7/17 Alston & Bird LLP - National Grid Response Letter to FERC 4-7-17 Request Letter 4/12/17 No LNG in PVD - Comment Letter to FERC about National Grid's proposed Fields Point Liquefaction Facility 4/24/17 RICRMC - Amended Agreement to Stay Six Month Review Period between RICRMC and National Grid 4/25/17 GZA - Short Term Response Action (STRA) Completion Report - Holder 18/21 Capping Project 4/27/17 GZA - Draft Public Involvement Plan with attachments - Version 2 5/4/17 GZA - Short Term Response Action Plan (STRAP) - Proposed Liquefaction Project 5/12/17 GZA - Short Term Response Action Plan (STRAP) Addendum - Holcim Driveway 5/30/17 RIDEM - Public Involvement Plan (PIP) Comment Letter 6/2/17 GZA - Response to Comments - Public Involvement Plan (PIP) 6/9/17 GZA - Final Public Involvement Plan with attachments (Version 3) 6/9/17 National Grid - Public Meeting Notice - Technical Information Session - English 6/23/2017 National Grid - Public Meeting Notice - Technical Information Session - Spanish 6/23/2017 RIDEM - Public Involvement Plan (PIP) Approval Letter 6/28/2017 National Grid - Public Notice - Established Informational Repository - English & Spanish 7/7/2017 National Grid - Second Public Meeting Notice - English, Spanish, Portuguese & Khmer 7/26/2017 RIDEM - Request to National Grid for Response to Public Comments on the STRAPs 8/18/2017 GZA - Meeting Summary, Response to Public Comments & Additional Clarifications - STRAP: Proposed Liquefaction Project, STRAP Addendum: Holcim Driveway 10/5/2017 RIDEM - Letter Response to STRAP Public Comments 10/6/2017 RIDEM - Liquefaction STRAP Comment Letter 10/6/2017 No LNG in PVD - Email to RIDEM regarding National Grid’s proposed STRAPs 10/10/2017 GZA - Short Term Response Action Plan (STRAP) Addendum - Proposed Liquefaction Facility 10/11/2017 RIDEM - Response Letter to No LNG in PVD's 10-10-17 email 10/13/2017 No LNG in PVD - Letter to Governor Raimondo regarding National Grid’s proposed Liquefaction STRAP 10/16/2017 RIDEM - Short Term Response Action Approval Letter - Liquefaction Facility Area 10/27/2017 No LNG in PVD - Appeal of Approved Short-Term Response Action 11/22/2017 GZA - Notification of Maintenance and Repair Projects 3/8/2018 Notice of Public Meeting for Water Quality Certification ApplicationNational Grid Letter/Application 9/12/16National Grid Letter/Application 4/4/17 3/30/2018 RIDEM Office of Water Resources - Letter to National Grid 3/30/2018 RIDEM - Administrative Adjudication Division - Decision and Order 5/18/2018 FERC - Order Issuing Certificate 10/17/2018 Notice of Water Quality Certificate and Response to CommentsSupporting Documentation:- Public Comment re: Water Quality Certification (12/4/17)- RIDEM - Request for Additional Information (3/30/18)- National Grid - Response to Request for Additional Information (7/20/18)- RIDEM - Request for Additional Information (9/5/18)- National Grid - Response to Request for Additional Information (10/25/18) 11/21/2018 National Grid - Fields Point Liquefaction Project - Monthly Status Report for November 2018 12/3/2018 Providence - Soil & Erosion Control Plan Approval 12/10/2018 GZA - Notification to Start Work – Liquefaction STRAP Project 12/28/2018 GZA - Notice to Abutters and/or Interested Parties (English, Spanish, Portuguese, Cape Verdean Creole and Khmer) 12/28/2018 GZA - Notification of Public Involvement Plan Sign Posting 1/2/2019 GZA - Notification of Maintenance & Repair Projects 1/8/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for December 2018 1/8/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-7-19 1/14/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-14-19 1/21/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-21-19 1/28/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for January 2019 2/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-28-19 2/4/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-4-19 2/11/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-11-19 2/18/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-18-19 2/25/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for February 2019 3/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-25-19 3/4/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-4-19 3/11/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-11-19 3/18/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-18-19 3/25/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-25-19 4/1/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for March 2019 4/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-1-19 4/8/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-8-19 4/15/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-15-19 4/22/2019 GGZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-22-19 4/29/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for April 2019 5/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-29-19 5/6/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-6-19 5/13/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-13-19 5/20/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-20-19 5/27/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-27-19 6/3/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for May 2019 6/3/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-3-19 6/10/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-10-19 6/17/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-17-19 6/24/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-24-19 7/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-1-19 7/8/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for June 2019 7/8/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-8-19 7/15/2019 GZA - Notification of Upcoming Maintenance Activities 7/22/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-15-19 7/22/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-22-19 7/29/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for July 2019 8/1/2019 National Grid - Email Notification of Emergency Gas Line Repair 8/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-29-19 8/5/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-5-19 8/13/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-12-19 8/19/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-19-19 8/26/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for August 2019 9/3/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-26-19 9/3/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-2-19 9/9/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-9-19 9/16/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-16-19 9/23/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-23-19 9/30/2019 GZA - Notification of Maintenance and Repair Projects 10/1/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for September 2019 10/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-30-19 10/7/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-7-19 10/15/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-14-19 10/21/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-21-19 10/28/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for October 2019 11/1/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-28-19 11/4/2019 GZA - Notification of Maintenance and Repair Project - Junction Box Support Installation 11/7/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-4-19 11/12/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-11-19 11/18/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-18-19 11/25/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-25-19 12/2/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for November 2019 12/2/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-2-19 12/9/2019 GZA - Application for CRMC Maintenance Certificate for Bulkhead Maintenance Repairs 12/16/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-9-19 12/16/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-16-19 12/23/2019 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-23-19 12/30/2019 National Grid - Fields Point Liquefaction Project - Monthly Status Report for December 2019 1/2/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-30-19 1/6/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-6-20 1/13/2020 GZA - Dike Access Road STRAP Completion Abutter Notification Fina - All Languages 1/17/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-13-20 1/21/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-20-20 1/27/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-27-20 2/3/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for January 2020 2/3/2020 GZA - Short Term Response Action (STRA) Completion Report - Dike Access Road Project 2/7/2020 GZA - Notice of Termination (NOT) – WQC No. 16-115 and RIPDES RIR101439 - Dike Access Road 2/7/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-27-20 2/10/2020 GZA - Bottom Sediment Sampling and Analysis, Proposed Drywell Closure Plan 3/10/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-9-20 3/16/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-10-20 2/17/2020 GZA - Proposed Drywell Closure Plan 2/19/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-17-20 2/24/2020 GZA - Notification of Maintenance and Repair Projects 2/28/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for February 2020 3/2/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-24-20 3/2/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-2-20 3/9/2020 RIDEM - Drywell Closure Plan Approval Letter 3/23/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-16-20 3/23/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-23-20 3/30/20 National Grid - Fields Point Liquefaction Project - Monthly Status Report for March 2020 4/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-30-20 4/6/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-6-20 4/13/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-13-20 4/20/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-20-20 4/27/2020 GZA - Notification of Maintenance and Repair Projects 5/1/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for March 2020 5/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-27-20 5/4/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-4-20 5/11/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-11-20 5/18/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-18-20 5/26/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-25-20 6/1/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for May 2020 6/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-1-20 6/8/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-8-20 6/15/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-15-20 6/22/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-22-20 6/29/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for June 2020 7/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-29-20 7/6/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-6-20 7/13/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-13-20 7/20/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-20-20 7/27/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-27-20 8/3/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for July 2020 8/3/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-3-20 8/11/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-10-20 8/17/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-17-20 8/24/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-24-20 8/31/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for August 2020 9/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-31-20 9/8/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-7-20 9/14/2020 GZA - Notification of Maintenance and Repair Projects 9/15/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-14-20 9/21/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-21-20 9/28/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for September 2020 10/1/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-28-20 10/5/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-5-20 10/12/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-12-20 10/19/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-19-20 10/26/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-26-20 11/2/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for October 2020 11/2/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-2-20 11/9/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-9-20 11/16/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-16-20 11/23/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-23-20 11/30/2020 National Grid - Fields Point Liquefaction Project - Monthly Status Report for November 2020 12/1/2020 GZA - Unanticipated Bypass Notification 11/25/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-30-20 12/7/2020 National Grid - Fields Point Liquefaction Project - Certificate Extension Request 12/8/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-7-20 12/14/2020 FERC - Fields Point Liquefaction Project - Notice of Request for Extension of Time 12/15/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-14-20 12/21/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-21-20 12/28/2020 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-28-20 1/4/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for December 2020 1/4/2021 ERC - Fields Point Liquefaction Project - Grant of Request for Extension of Time 1/11/202 1/7/2021 GZA - Monitoring Report - 2014-2017 with Attachments 1/7/2021 GZA - Monitoring Report - 2018 with Attachments 1/7/2021 GZA - Monitoring Report - 2019 with Attachments 1/7/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-4-21 1/11/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-11-21 1/19/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-18-21 1/25/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for January 2021 2/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-25-21 2/1/2021 GZA - Notification of Maintenance and Repair Projects 2/5/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-1-21 2/8/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-8-21 2/15/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-15-21 2/22/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for February 2021 3/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-22-21 3/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-1-21 3/8/2021 GZA - Monitoring Report - 2020 with Attachments 3/9/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-8-21 3/15/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-15-21 3/22/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-22-21 3/30/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for March 2021 4/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-29-21 4/5/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-5-21 4/12/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-12-21 4/19/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-19-21 4/26/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for April 2021 5/3/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-26-21 5/3/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-3-21 5/10/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-10-21 5/17/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-17-21 5/24/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for May 2021 6/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-24-21 6/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-31-21 6/7/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-7-21 6/14/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-14-21 6/21/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-21-21 6/28/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for June 2021 7/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-28-21 7/6/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-5-21 7/12/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-12-21 7/19/2021 GZA - Replacement Monitoring Wells Installation Work Plan 7/22/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-19-21 7/26/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for July 2021 8/2/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 7-26-21 8/2/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-2-21 8/9/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-9-21 8/16/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-16-21 8/23/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-23-21 8/30/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for July 2021 9/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 8-30-21 9/6/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-6-21 9/13/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-13-21 9/20/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-20-21 9/27/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for September 2021 10/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 9-27-21 10/4/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-4-21 10/11/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-11-21 10/18/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-18-21 10/25/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for October 2021 11/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 10-25-21 11/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-1-21 11/8/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-8-21 11/15/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-15-21 11/22/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-22-21 11/29/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for November 2021 12/1/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 11-29-21 12/6/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-6-21 12/13/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-13-21 12/20/2021 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-20-21 12/27/2021 National Grid - Fields Point Liquefaction Project - Monthly Status Report for December 2021 1/4/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 12-27-21 1/4/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-3-22 1/10/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-10-22 1/18/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-17-22 1/24/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-24-22 1/31/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for January 2022 2/1/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 1-31-22 2/7/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-7-22 2/14/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-14-22 2/22/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-21-22 2/28/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for February 2022 3/1/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 2-28-22 3/7/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-7-22 3/14/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-14-22 3/21/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-21-22 3/28/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for March 2022 4/1/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 3-28-22 4/4/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-4-22 4/11/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-11-22 4/18/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-18-22 4/25/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for April 2022 5/2/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 4-25-22 5/2/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-2-22 5/9/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-9-22 5/16/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring Demobilization 5/19/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-16-22 5/23/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-23-22 5/31/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for May 2022 6/1/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 5-30-22 6/6/2022 GZA - Notification of Maintenance and Repair Projects 6/7/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-6-22 6/13/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-13-22 6/21/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-20-22 6/27/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for June 2022 7/1/2022 GZA - Liquefaction STRAP Perimeter Air Quality Monitoring (AQM) Results – Week of 6-27-22 7/5/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for July 2022 8/1/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for August 2022 9/1/2022 Rhode Island Energy - Annual Monitoring Report - 2021 9/9/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for September 2022 10/3/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for October 2022 11/1/2022 National Grid - Fields Point Liquefaction Project - Monthly Status Report for November 2022 12/1/2022 National Grid - Replacement Monitoring Wells Installation Work Plan 12/27/2022 GZA - Notification of Maintenance and Repair Projects 2/8/2023 GZA - Fields Point Liquefaction Project (FPLP) Short Term Response Action (STRA) Closure Report 3/21/2023 GZA - Notification of Maintenance and Repair Projects 4/20/2023 GZA - Annual Monitoring Report - 2022 6/21/2023 GZA - Notification of Maintenance and Repair Projects 6/23/2023 GZA - Notification of Maintenance and Repair Projects 8/23/2023 GZA - Site Investigation Report (SIR) Addendum 4/18/2024 GZA - Notification of Maintenance and Repair Projects 5/9/2024 GZA - Notification of Maintenance and Repair Projects 10/8/2024