RI Recycled Metals (Former Boliden)

Document Description Date
Public Meeting #2 - Handouts & Slides 12/4/2024
Response to Public Comments 11/26/2024
Public Notification & Comment Period Extension 11/21/2024
Public Notice - PIP Public Meeting #2 11/15/2024
Post-SIR Public Notice (Remedial Alternative) 11/1/2024
Meeting Summary - PIP Public Meeting, Aug. 6, 2024 10/18/2024
Program Letter 10/8/2024
PIP Public Comments & Meeting 10/4/2024
Remedial Design Comment Response 2 9/20/2024
Remedial Design Comment Letter Clarification 9/11/2024
RIDEM Email - Status of PIP Public Meeting Summary 9/9/2024
Response Email - Status of PIP Public Meeting Summary 9/9/2024
Remedial Design Comment Response 8/29/2024
Remedial Design Comment Letter 8/23/2024
Public Notice - PIP Public Meeting 7/12/2024
Focused Compliance Inspection Report 7/12/2024
RIRM Response to Remedy Comments 7/11/2024
Conceptual Remedy Comments 6/20/2024
SIR Addendum - Post-Fire Sampling 6/17/2024
Post-Fire Sampling & PIP Public Mtg. Deadline 6/11/2024
Meeting Summary for May 9, 2024 5/21/2024
Post-Fire Sampling & PIP Public Mtg ext. 5/17/2024
Post-Fire Sampling & PIP Public Mtg 4/30/2024
Post-Fire Sampling Required - Letter 4/22/2024
RIRM Proposed Conceptual Remedy 4/1/2024
Updated Analytical Report w. TCLP (1 of 2) 3/11/2024
Updated Analytical Report w. TCLP (2 of 2) 3/11/2024
Follow-Up Feb. 22, 2024 Meeting - Letter 2/29/2024
Final DRAFT PIP for Comment 2/23/2024
RIDEM Response to RIRM Draft PIP v2.0 2/5/2024
RIDEM Response to LSE Comment Responses 2/2/2024
RIRM Response to Comments on PIP Draft 1.0 2/1/2024
Draft PIP version 2.0 2/1/2024
RIRM Response to RIDEM SIR Comments 1/12/2024
Draft Public Involvement Plan (PIP) 12/28/2023
SIR Comment Letter 12/27/2023
Site Investigation Report (SIR) 12/12/2023
Public Involvement Plan (PIP) Initiation Letter 11/16/2023
Petition for Public Involvement Plan for RIRM 11/14/2023
Status Report Memo for Oct. 31 - Nov. 10, 2023 11/10/2023
Status Report Memo for Sept. 6 - Oct. 19, 2023 10/20/2023
Pre-SI Notification to Abutters - English 10/17/2023
Pre-SI Notification to Abutters - Spanish 10/17/2023
SIR Sampling Plan Site Figure 10/17/2023
DEM Response to Revised SIWP 8/18/2023
Site Investigation Work Plan - Revised 8/8/2023
DEM Environmental Justice Fact Sheet - English 8/1/2023
DEM Environmental Justice Fact Sheet - Spanish 8/1/2023
Site Plat Map 7/31/2023
Clarification of SI Requirements 6/30/2023
Site Investigation Work Plan - Comment Letter 6/12/2023
SIR Work Plan 6/6/2023
RIRM Permitting Plan Set 5/16/2023
Meeting Minutes - DEM, RIDEM 3/30/2023
Phase II Subsurface Investigation Report 3/8/2016
Memo to File - Field Inspection Notes 5/20/2015
Construction Period SWPPP Site Plans - Revised December 2012 12/28/2012
Multisector General Permit SWPPP Plans - Revised December 2012 12/28/2012
RIPDES Construction General Permit SWPPP - Revised December 2012 12/28/2012
RIPDES Multisector General Permit SWPPP - Revised December 2012 12/28/2012
Construction Period SWPPP Site Plans - Revised August 2012 8/23/2012
Multisector General Permit SWPPP Plans - Revised August 2012 8/23/2012
RIPDES Construction General Permit SWPPP - Revised August 2012 8/23/2012
RIPDES Multisector General Permit SWPPP - Revised August 2012 8/23/2012
Inspection Photos 1 12/14/2011
Inspection Photos 2 12/14/2011
2011 Annual ELUR Inspection 9/26/2011
Letter of Non-Compliance 8/17/2011
Note to File 12/21/2010
CRMC Assent Application Narrative 11/1/2010
RIPDES Application Number RIR50N099 11/1/2010
Approval to Revised Cap Disturbance 10/27/2010
Request for Soil Disturbance SMP - Revised 10/25/2010
Request for Soil Disturbance Approval - Revised - 2 10/25/2010
Request for Soil Disturbance Approval - Revised 4/30/2010
Approval to Disturb Cap 3/29/2010
New Bulkhead & Improvement Dredging Project 2/10/2010
Request for Soil Disturbance Approval 1/4/2010
Response to Notice of Overdue Inspection 10/23/2007
Notice - Overdue Annual Inspection Report 10/3/2007
2006 Annual Inspection 9/7/2006
Response to NOIE by New Owner (ACR Realty) 8/25/2006
Response to NOIE by Previous Owner (Mapleville) 8/23/2006
Notice of Intent to Enforce (NOIE) 8/3/2006
2005 Annual Inspection Report 7/11/2005
2004 Annual Inspection Report 5/3/2004
EPA NFRAP Letter & SMP 2/12/2004
EPA NFRAP Letter & 1994 Quality Assurance Project Plan 2/12/2004
Letter of Compliance 3/21/2003
Cover Letter for ELUR 2/7/2003
ELUR - Recorded & Stamped 2/3/2003
Remedial Decision Letter & Remedial Approval Letter 1/16/2003
Remedial Approval Fee - Cover Letter 1/13/2003
Notification to Abutters - Comment Period 9/5/2002
Notification to Abutters of Site Investigation 8/7/2002
Letter of Responsibility, dated October 5, 1999 8/5/2002
Record of Telephone Call 11/27/2001
Draft ELUR Follow Up 11/19/2001
Discussion of Remedial Alternatives 12/26/2000
Summary of Groundwater Sampling Results 9/26/2000
Report of Analytical Results 6/26/2000
Meeting Attendance Sign-In Sheet 5/30/2000
DEM Response to January 20, 2000 Letter 5/26/2000
Soil Management Plan Notification to Abutters Letter 3/24/2000
Site Access Agreement Request 3/13/2000
Response to LOR & Draft ELUR 1/20/2000
Groundwater Sampling 1/13/2000
Certificate of Completion 8/4/1999
Report of Analytical Results 2/15/1999
Cover Letter to Cleanup Verification Report 5/4/1998
Cleanup Verification Report & Appendices A - E 5/4/1998
Cleanup Verification Report - Appendix F - Vol. 1 of 5 5/4/1998
Cleanup Verification Report - Appendix F - Vol. 2 of 5 5/4/1998
Cleanup Verification Report - Appendix F - Vol. 3 of 5 5/4/1998
Cleanup Verification Report - Appendix F - Vol. 4 of 5 5/4/1998
Cleanup Verification Report - Appendix F - Vol. 5 of 5 5/4/1998
Cleanup Verification Report - Appendix G 5/4/1998
Cleanup Verification Report - Appendix H - Vol. 1 of 2 5/4/1998
Cleanup Verification Report - Appendix H - Vol. 2 of 2 5/4/1998
Cleanup Verification Report - Appendix I 5/4/1998
Cleanup Verification Report - Appendix J - Vol. 1 of 2 5/4/1998
Cleanup Verification Report - Appendix J - Vol. 2 of 2 5/4/1998
Cleanup Verification Report - Appendix K - Vol. 1 of 2 5/4/1998
Cleanup Verification Report - Appendix K - Vol. 2 of 2 5/4/1998
Cleanup Verification Report - Appendix L 5/4/1998
Cleanup Verification Report - Appendix M 5/4/1998
Cleanup Verification Report - Appendix N 5/4/1998
Cleanup Verification Report - Appendix O 5/4/1998
PCB Soil Disposal Confirmation 2/28/1998
Soil Analytical Results 2/26/1998
Site Remediation Project Agenda 2/23/1998
VHB Project Narrative 2/23/1998
Soil Management Work Plan - Revised 2/9/1998
Groundwater Sampling Location Plan 1/3/1998
EPA Work Plan Approval 6/27/1997
EPA Record of Verbal Comments on Work Plan 6/23/1997
Soil Management Work Plan 6/16/1997
Quantitation Report (Lab) 10/20/1996
Final Site Inspection Report (no attachments) 2/19/1993
Final Site Inspection Report - Complete 2/19/1993
Dept. Comments - Superfund Support Draft Site Inspection 1/11/1993
[Memo] Trip Report - Site Recon. & Sampling 8/7/1992
Trip Report - Site Recon. & Sampling 8/7/1992
Preliminary Assessment - Cover Letter 11/26/1990
CERCLA Letters 4/19/1988
EPA Potential Hazardous Waste Sites 2/23/1988