RI Recycled Metals (Former Boliden) Document Description Date Public Meeting #2 - Handouts & Slides 12/4/2024 Response to Public Comments 11/26/2024 Public Notification & Comment Period Extension 11/21/2024 Public Notice - PIP Public Meeting #2 11/15/2024 Post-SIR Public Notice (Remedial Alternative) 11/1/2024 Meeting Summary - PIP Public Meeting, Aug. 6, 2024 10/18/2024 Program Letter 10/8/2024 PIP Public Comments & Meeting 10/4/2024 Remedial Design Comment Response 2 9/20/2024 Remedial Design Comment Letter Clarification 9/11/2024 RIDEM Email - Status of PIP Public Meeting Summary 9/9/2024 Response Email - Status of PIP Public Meeting Summary 9/9/2024 Remedial Design Comment Response 8/29/2024 Remedial Design Comment Letter 8/23/2024 Public Notice - PIP Public Meeting 7/12/2024 Focused Compliance Inspection Report 7/12/2024 RIRM Response to Remedy Comments 7/11/2024 Conceptual Remedy Comments 6/20/2024 SIR Addendum - Post-Fire Sampling 6/17/2024 Post-Fire Sampling & PIP Public Mtg. Deadline 6/11/2024 Meeting Summary for May 9, 2024 5/21/2024 Post-Fire Sampling & PIP Public Mtg ext. 5/17/2024 Post-Fire Sampling & PIP Public Mtg 4/30/2024 Post-Fire Sampling Required - Letter 4/22/2024 RIRM Proposed Conceptual Remedy 4/1/2024 Updated Analytical Report w. TCLP (1 of 2) 3/11/2024 Updated Analytical Report w. TCLP (2 of 2) 3/11/2024 Follow-Up Feb. 22, 2024 Meeting - Letter 2/29/2024 Final DRAFT PIP for Comment 2/23/2024 RIDEM Response to RIRM Draft PIP v2.0 2/5/2024 RIDEM Response to LSE Comment Responses 2/2/2024 RIRM Response to Comments on PIP Draft 1.0 2/1/2024 Draft PIP version 2.0 2/1/2024 RIRM Response to RIDEM SIR Comments 1/12/2024 Draft Public Involvement Plan (PIP) 12/28/2023 SIR Comment Letter 12/27/2023 Site Investigation Report (SIR) 12/12/2023 Public Involvement Plan (PIP) Initiation Letter 11/16/2023 Petition for Public Involvement Plan for RIRM 11/14/2023 Status Report Memo for Oct. 31 - Nov. 10, 2023 11/10/2023 Status Report Memo for Sept. 6 - Oct. 19, 2023 10/20/2023 Pre-SI Notification to Abutters - English 10/17/2023 Pre-SI Notification to Abutters - Spanish 10/17/2023 SIR Sampling Plan Site Figure 10/17/2023 DEM Response to Revised SIWP 8/18/2023 Site Investigation Work Plan - Revised 8/8/2023 DEM Environmental Justice Fact Sheet - English 8/1/2023 DEM Environmental Justice Fact Sheet - Spanish 8/1/2023 Site Plat Map 7/31/2023 Clarification of SI Requirements 6/30/2023 Site Investigation Work Plan - Comment Letter 6/12/2023 SIR Work Plan 6/6/2023 RIRM Permitting Plan Set 5/16/2023 Meeting Minutes - DEM, RIDEM 3/30/2023 Phase II Subsurface Investigation Report 3/8/2016 Memo to File - Field Inspection Notes 5/20/2015 Construction Period SWPPP Site Plans - Revised December 2012 12/28/2012 Multisector General Permit SWPPP Plans - Revised December 2012 12/28/2012 RIPDES Construction General Permit SWPPP - Revised December 2012 12/28/2012 RIPDES Multisector General Permit SWPPP - Revised December 2012 12/28/2012 Construction Period SWPPP Site Plans - Revised August 2012 8/23/2012 Multisector General Permit SWPPP Plans - Revised August 2012 8/23/2012 RIPDES Construction General Permit SWPPP - Revised August 2012 8/23/2012 RIPDES Multisector General Permit SWPPP - Revised August 2012 8/23/2012 Inspection Photos 1 12/14/2011 Inspection Photos 2 12/14/2011 2011 Annual ELUR Inspection 9/26/2011 Letter of Non-Compliance 8/17/2011 Note to File 12/21/2010 CRMC Assent Application Narrative 11/1/2010 RIPDES Application Number RIR50N099 11/1/2010 Approval to Revised Cap Disturbance 10/27/2010 Request for Soil Disturbance SMP - Revised 10/25/2010 Request for Soil Disturbance Approval - Revised - 2 10/25/2010 Request for Soil Disturbance Approval - Revised 4/30/2010 Approval to Disturb Cap 3/29/2010 New Bulkhead & Improvement Dredging Project 2/10/2010 Request for Soil Disturbance Approval 1/4/2010 Response to Notice of Overdue Inspection 10/23/2007 Notice - Overdue Annual Inspection Report 10/3/2007 2006 Annual Inspection 9/7/2006 Response to NOIE by New Owner (ACR Realty) 8/25/2006 Response to NOIE by Previous Owner (Mapleville) 8/23/2006 Notice of Intent to Enforce (NOIE) 8/3/2006 2005 Annual Inspection Report 7/11/2005 2004 Annual Inspection Report 5/3/2004 EPA NFRAP Letter & SMP 2/12/2004 EPA NFRAP Letter & 1994 Quality Assurance Project Plan 2/12/2004 Letter of Compliance 3/21/2003 Cover Letter for ELUR 2/7/2003 ELUR - Recorded & Stamped 2/3/2003 Remedial Decision Letter & Remedial Approval Letter 1/16/2003 Remedial Approval Fee - Cover Letter 1/13/2003 Notification to Abutters - Comment Period 9/5/2002 Notification to Abutters of Site Investigation 8/7/2002 Letter of Responsibility, dated October 5, 1999 8/5/2002 Record of Telephone Call 11/27/2001 Draft ELUR Follow Up 11/19/2001 Discussion of Remedial Alternatives 12/26/2000 Summary of Groundwater Sampling Results 9/26/2000 Report of Analytical Results 6/26/2000 Meeting Attendance Sign-In Sheet 5/30/2000 DEM Response to January 20, 2000 Letter 5/26/2000 Soil Management Plan Notification to Abutters Letter 3/24/2000 Site Access Agreement Request 3/13/2000 Response to LOR & Draft ELUR 1/20/2000 Groundwater Sampling 1/13/2000 Certificate of Completion 8/4/1999 Report of Analytical Results 2/15/1999 Cover Letter to Cleanup Verification Report 5/4/1998 Cleanup Verification Report & Appendices A - E 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 1 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 2 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 3 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 4 of 5 5/4/1998 Cleanup Verification Report - Appendix F - Vol. 5 of 5 5/4/1998 Cleanup Verification Report - Appendix G 5/4/1998 Cleanup Verification Report - Appendix H - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix H - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix I 5/4/1998 Cleanup Verification Report - Appendix J - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix J - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix K - Vol. 1 of 2 5/4/1998 Cleanup Verification Report - Appendix K - Vol. 2 of 2 5/4/1998 Cleanup Verification Report - Appendix L 5/4/1998 Cleanup Verification Report - Appendix M 5/4/1998 Cleanup Verification Report - Appendix N 5/4/1998 Cleanup Verification Report - Appendix O 5/4/1998 PCB Soil Disposal Confirmation 2/28/1998 Soil Analytical Results 2/26/1998 Site Remediation Project Agenda 2/23/1998 VHB Project Narrative 2/23/1998 Soil Management Work Plan - Revised 2/9/1998 Groundwater Sampling Location Plan 1/3/1998 EPA Work Plan Approval 6/27/1997 EPA Record of Verbal Comments on Work Plan 6/23/1997 Soil Management Work Plan 6/16/1997 Quantitation Report (Lab) 10/20/1996 Final Site Inspection Report (no attachments) 2/19/1993 Final Site Inspection Report - Complete 2/19/1993 Dept. Comments - Superfund Support Draft Site Inspection 1/11/1993 [Memo] Trip Report - Site Recon. & Sampling 8/7/1992 Trip Report - Site Recon. & Sampling 8/7/1992 Preliminary Assessment - Cover Letter 11/26/1990 CERCLA Letters 4/19/1988 EPA Potential Hazardous Waste Sites 2/23/1988