RI Recycled Metals (Former Boliden)

Document Description Date
EPA Potential Hazardous Waste Sites 02/23/1988
CERCLA Letters 04/19/1988
Preliminary Assessment - Cover Letter 11/26/1990
[Memo] Trip Report - Site Recon. & Sampling 08/07/1992
Trip Report - Site Recon. & Sampling 08/07/1992
Dept. Comments - Superfund Support Draft Site Inspection 01/11/1993
Final Site Inspection Report (no attachments) 02/19/1993
Final Site Inspection Report - Complete 02/19/1993
Quantitation Report (Lab) 10/20/1996
Soil Management Work Plan 06/16/1997
EPA Record of Verbal Comments on Work Plan 06/23/1997
EPA Work Plan Approval 06/27/1997
Groundwater Sampling Location Plan 01/03/1998
Soil Management Work Plan - Revised 02/09/1998
Site Remediation Project Agenda 02/23/1998
VHB Project Narrative 02/23/1998
Soil Analytical Results 02/26/1998
PCB Soil Disposal Confirmation 02/28/1998
Cover Letter to Cleanup Verification Report 05/04/1998
Cleanup Verification Report & Appendices A - E 05/04/1998
Cleanup Verification Report - Appendix F - Vol. 1 of 5 05/04/1998
Cleanup Verification Report - Appendix F - Vol. 2 of 5 05/04/1998
Cleanup Verification Report - Appendix F - Vol. 3 of 5 05/04/1998
Cleanup Verification Report - Appendix F - Vol. 4 of 5 05/04/1998
Cleanup Verification Report - Appendix F - Vol. 5 of 5 05/04/1998
Cleanup Verification Report - Appendix G 05/04/1998
Cleanup Verification Report - Appendix H - Vol. 1 of 2 05/04/1998
Cleanup Verification Report - Appendix H - Vol. 2 of 2 05/04/1998
Cleanup Verification Report - Appendix I 05/04/1998
Cleanup Verification Report - Appendix J - Vol. 1 of 2 05/04/1998
Cleanup Verification Report - Appendix J - Vol. 2 of 2 05/04/1998
Cleanup Verification Report - Appendix K - Vol. 1 of 2 05/04/1998
Cleanup Verification Report - Appendix K - Vol. 2 of 2 05/04/1998
Cleanup Verification Report - Appendix L 05/04/1998
Cleanup Verification Report - Appendix M 05/04/1998
Cleanup Verification Report - Appendix N 05/04/1998
Cleanup Verification Report - Appendix O 05/04/1998
Report of Analytical Results 02/15/1999
Certificate of Completion 08/04/1999
Groundwater Sampling 01/13/2000
Response to LOR & Draft ELUR 01/20/2000
Site Access Agreement Request 03/13/2000
Soil Management Plan Notification to Abutters Letter 03/24/2000
DEM Response to January 20, 2000 Letter 05/26/2000
Meeting Attendance Sign-In Sheet 05/30/2000
Report of Analytical Results 06/26/2000
Summary of Groundwater Sampling Results 09/26/2000
Discussion of Remedial Alternatives 12/26/2000
Draft ELUR Follow Up 11/19/2001
Record of Telephone Call 11/27/2001
Letter of Responsibility, dated October 5, 1999 08/05/2002
Notification to Abutters of Site Investigation 08/07/2002
Notification to Abutters - Comment Period 09/05/2002
Remedial Approval Fee - Cover Letter 01/13/2003
Remedial Decision Letter & Remedial Approval Letter 01/16/2003
ELUR - Recorded & Stamped 02/03/2003
Cover Letter for ELUR 02/07/2003
Letter of Compliance 03/21/2003
EPA NFRAP Letter & SMP 02/12/2004
EPA NFRAP Letter & 1994 Quality Assurance Project Plan 02/12/2004
2004 Annual Inspection Report 05/03/2004
2005 Annual Inspection Report 07/11/2005
Notice of Intent to Enforce (NOIE) 08/03/2006
Response to NOIE by Previous Owner (Mapleville) 08/23/2006
Response to NOIE by New Owner (ACR Realty) 08/25/2006
2006 Annual Inspection 09/07/2006
Notice - Overdue Annual Inspection Report 10/03/2007
Response to Notice of Overdue Inspection 10/23/2007
Request for Soil Disturbance Approval 01/04/2010
New Bulkhead & Improvement Dredging Project 02/10/2010
Approval to Disturb Cap 03/29/2010
Request for Soil Disturbance Approval - Revised 04/30/2010
Request for Soil Disturbance SMP - Revised 10/25/2010
Request for Soil Disturbance Approval - Revised - 2 10/25/2010
Approval to Revised Cap Disturbance 10/27/2010
CRMC Assent Application Narrative 11/01/2010
RIPDES Application Number RIR50N099 11/01/2010
Note to File 12/21/2010
Letter of Non-Compliance 08/17/2011
2011 Annual ELUR Inspection 09/26/2011
Inspection Photos 1 12/14/2011
Inspection Photos 2 12/14/2011
Construction Period SWPPP Site Plans - Revised August 2012 08/23/2012
Multisector General Permit SWPPP Plans - Revised August 2012 08/23/2012
RIPDES Construction General Permit SWPPP - Revised August 2012 08/23/2012
RIPDES Multisector General Permit SWPPP - Revised August 2012 08/23/2012
Construction Period SWPPP Site Plans - Revised December 2012 12/28/2012
Multisector General Permit SWPPP Plans - Revised December 2012 12/28/2012
RIPDES Construction General Permit SWPPP - Revised December 2012 12/28/2012
RIPDES Multisector General Permit SWPPP - Revised December 2012 12/28/2012
Memo to File - Field Inspection Notes 05/20/2015
Meeting Minutes - DEM, RIDEM 03/30/2023
RIRM Permitting Plan Set 05/16/2023
SIR Work Plan 06/06/2023
Site Investigation Work Plan - Comment Letter 06/12/2023
Clarification of SI Requirements 06/30/2023
Site Plat Map 07/31/2023
DEM Environmental Justice Fact Sheet - English 08/01/2023
DEM Environmental Justice Fact Sheet - Spanish 08/01/2023
Site Investigation Work Plan - Revised 08/08/2023
DEM Response to Revised SIWP 08/18/2023
Pre-SI Notification to Abutters - English 10/17/2023
Pre-SI Notification to Abutters - Spanish 10/17/2023
SIR Sampling Plan Site Figure 10/17/2023
Status Report Memo for Sept. 6 - Oct. 19, 2023 10/20/2023
Status Report Memo for Oct. 31 - Nov. 10, 2023 11/10/2023
Petition for Public Involvement Plan for RIRM 11/14/2023
Public Involvement Plan (PIP) Initiation Letter 11/16/2023
Site Investigation Report (SIR) 12/12/2023
SIR Comment Letter 12/27/2023
Draft Public Involvement Plan (PIP) 12/28/2023
RIRM Response to RIDEM SIR Comments 01/12/2024
RIRM Response to Comments on PIP Draft 1.0 02/01/2024
Draft PIP version 2.0 02/01/2024
RIDEM Response to LSE Comment Responses 02/02/2024
RIDEM Response to RIRM Draft PIP v2.0 02/05/2024
Final DRAFT PIP for Comment 02/23/2024
Follow-Up Feb. 22, 2024 Meeting - Letter 02/29/2024
Updated Analytical Report w. TCLP (1 of 2) 03/11/2024
Updated Analytical Report w. TCLP (2 of 2) 03/11/2024
RIRM Proposed Conceptual Remedy 04/01/2024
Post-Fire Sampling Required - Letter 04/22/2024