RI Recycled Metals (Former Boliden) Document Description Date EPA Potential Hazardous Waste Sites 02/23/1988 CERCLA Letters 04/19/1988 Preliminary Assessment - Cover Letter 11/26/1990 [Memo] Trip Report - Site Recon. & Sampling 08/07/1992 Trip Report - Site Recon. & Sampling 08/07/1992 Dept. Comments - Superfund Support Draft Site Inspection 01/11/1993 Final Site Inspection Report (no attachments) 02/19/1993 Final Site Inspection Report - Complete 02/19/1993 Quantitation Report (Lab) 10/20/1996 Soil Management Work Plan 06/16/1997 EPA Record of Verbal Comments on Work Plan 06/23/1997 EPA Work Plan Approval 06/27/1997 Groundwater Sampling Location Plan 01/03/1998 Soil Management Work Plan - Revised 02/09/1998 Site Remediation Project Agenda 02/23/1998 VHB Project Narrative 02/23/1998 Soil Analytical Results 02/26/1998 PCB Soil Disposal Confirmation 02/28/1998 Cover Letter to Cleanup Verification Report 05/04/1998 Cleanup Verification Report & Appendices A - E 05/04/1998 Cleanup Verification Report - Appendix F - Vol. 1 of 5 05/04/1998 Cleanup Verification Report - Appendix F - Vol. 2 of 5 05/04/1998 Cleanup Verification Report - Appendix F - Vol. 3 of 5 05/04/1998 Cleanup Verification Report - Appendix F - Vol. 4 of 5 05/04/1998 Cleanup Verification Report - Appendix F - Vol. 5 of 5 05/04/1998 Cleanup Verification Report - Appendix G 05/04/1998 Cleanup Verification Report - Appendix H - Vol. 1 of 2 05/04/1998 Cleanup Verification Report - Appendix H - Vol. 2 of 2 05/04/1998 Cleanup Verification Report - Appendix I 05/04/1998 Cleanup Verification Report - Appendix J - Vol. 1 of 2 05/04/1998 Cleanup Verification Report - Appendix J - Vol. 2 of 2 05/04/1998 Cleanup Verification Report - Appendix K - Vol. 1 of 2 05/04/1998 Cleanup Verification Report - Appendix K - Vol. 2 of 2 05/04/1998 Cleanup Verification Report - Appendix L 05/04/1998 Cleanup Verification Report - Appendix M 05/04/1998 Cleanup Verification Report - Appendix N 05/04/1998 Cleanup Verification Report - Appendix O 05/04/1998 Report of Analytical Results 02/15/1999 Certificate of Completion 08/04/1999 Groundwater Sampling 01/13/2000 Response to LOR & Draft ELUR 01/20/2000 Site Access Agreement Request 03/13/2000 Soil Management Plan Notification to Abutters Letter 03/24/2000 DEM Response to January 20, 2000 Letter 05/26/2000 Meeting Attendance Sign-In Sheet 05/30/2000 Report of Analytical Results 06/26/2000 Summary of Groundwater Sampling Results 09/26/2000 Discussion of Remedial Alternatives 12/26/2000 Draft ELUR Follow Up 11/19/2001 Record of Telephone Call 11/27/2001 Letter of Responsibility, dated October 5, 1999 08/05/2002 Notification to Abutters of Site Investigation 08/07/2002 Notification to Abutters - Comment Period 09/05/2002 Remedial Approval Fee - Cover Letter 01/13/2003 Remedial Decision Letter & Remedial Approval Letter 01/16/2003 ELUR - Recorded & Stamped 02/03/2003 Cover Letter for ELUR 02/07/2003 Letter of Compliance 03/21/2003 EPA NFRAP Letter & SMP 02/12/2004 EPA NFRAP Letter & 1994 Quality Assurance Project Plan 02/12/2004 2004 Annual Inspection Report 05/03/2004 2005 Annual Inspection Report 07/11/2005 Notice of Intent to Enforce (NOIE) 08/03/2006 Response to NOIE by Previous Owner (Mapleville) 08/23/2006 Response to NOIE by New Owner (ACR Realty) 08/25/2006 2006 Annual Inspection 09/07/2006 Notice - Overdue Annual Inspection Report 10/03/2007 Response to Notice of Overdue Inspection 10/23/2007 Request for Soil Disturbance Approval 01/04/2010 New Bulkhead & Improvement Dredging Project 02/10/2010 Approval to Disturb Cap 03/29/2010 Request for Soil Disturbance Approval - Revised 04/30/2010 Request for Soil Disturbance SMP - Revised 10/25/2010 Request for Soil Disturbance Approval - Revised - 2 10/25/2010 Approval to Revised Cap Disturbance 10/27/2010 CRMC Assent Application Narrative 11/01/2010 RIPDES Application Number RIR50N099 11/01/2010 Note to File 12/21/2010 Letter of Non-Compliance 08/17/2011 2011 Annual ELUR Inspection 09/26/2011 Inspection Photos 1 12/14/2011 Inspection Photos 2 12/14/2011 Construction Period SWPPP Site Plans - Revised August 2012 08/23/2012 Multisector General Permit SWPPP Plans - Revised August 2012 08/23/2012 RIPDES Construction General Permit SWPPP - Revised August 2012 08/23/2012 RIPDES Multisector General Permit SWPPP - Revised August 2012 08/23/2012 Construction Period SWPPP Site Plans - Revised December 2012 12/28/2012 Multisector General Permit SWPPP Plans - Revised December 2012 12/28/2012 RIPDES Construction General Permit SWPPP - Revised December 2012 12/28/2012 RIPDES Multisector General Permit SWPPP - Revised December 2012 12/28/2012 Memo to File - Field Inspection Notes 05/20/2015 Phase II Subsurface Investigation Report 03/08/2016 Meeting Minutes - DEM, RIDEM 03/30/2023 RIRM Permitting Plan Set 05/16/2023 SIR Work Plan 06/06/2023 Site Investigation Work Plan - Comment Letter 06/12/2023 Clarification of SI Requirements 06/30/2023 Site Plat Map 07/31/2023 DEM Environmental Justice Fact Sheet - English 08/01/2023 DEM Environmental Justice Fact Sheet - Spanish 08/01/2023 Site Investigation Work Plan - Revised 08/08/2023 DEM Response to Revised SIWP 08/18/2023 Pre-SI Notification to Abutters - English 10/17/2023 Pre-SI Notification to Abutters - Spanish 10/17/2023 SIR Sampling Plan Site Figure 10/17/2023 Status Report Memo for Sept. 6 - Oct. 19, 2023 10/20/2023 Status Report Memo for Oct. 31 - Nov. 10, 2023 11/10/2023 Petition for Public Involvement Plan for RIRM 11/14/2023 Public Involvement Plan (PIP) Initiation Letter 11/16/2023 Site Investigation Report (SIR) 12/12/2023 SIR Comment Letter 12/27/2023 Draft Public Involvement Plan (PIP) 12/28/2023 RIRM Response to RIDEM SIR Comments 01/12/2024 RIRM Response to Comments on PIP Draft 1.0 02/01/2024 Draft PIP version 2.0 02/01/2024 RIDEM Response to LSE Comment Responses 02/02/2024 RIDEM Response to RIRM Draft PIP v2.0 02/05/2024 Final DRAFT PIP for Comment 02/23/2024 Follow-Up Feb. 22, 2024 Meeting - Letter 02/29/2024 Updated Analytical Report w. TCLP (1 of 2) 03/11/2024 Updated Analytical Report w. TCLP (2 of 2) 03/11/2024 RIRM Proposed Conceptual Remedy 04/01/2024 Post-Fire Sampling Required - Letter 04/22/2024 Post-Fire Sampling & PIP Public Mtg 04/30/2024 Post-Fire Sampling & PIP Public Mtg ext. 05/17/2024 Meeting Summary for May 9, 2024 05/21/2024 Post-Fire Sampling & PIP Public Mtg. Deadline 06/11/2024 SIR Addendum - Post-Fire Sampling 06/17/2024 Conceptual Remedy Comments 06/20/2024 RIRM Response to Remedy Comments 07/11/2024 Public Notice - PIP Public Meeting 07/12/2024 Remedial Design Comment Letter 08/23/2024 Remedial Design Comment Response 08/29/2024 RIDEM Email - Status of PIP Public Meeting Summary 09/09/2024 Response Email - Status of PIP Public Meeting Summary 09/09/2024 Remedial Design Comment Letter Clarification 09/11/2024 Remedial Design Comment Response 2 09/20/2024 PIP Public Comments & Meeting 10/04/2024 Program Letter 10/08/2024 Post-SIR Public Notice (Remedial Alternative) 11/01/2024 Public Notice - PIP Public Meeting #2 11/15/2024