Official State of Rhode Island website

  • Change the visual color theme between light or dark modes
  • Adjust the font size from the system default to a larger size
  • Adjust the space between lines of text from the system default to a larger size
  • Adjust the space between words from the system default to a larger size

Permitting

An icon graphic of a red triangle with a white exclamation mark on top

OWR Permit Application Portal Now Available

DEM has launched the first phase of a new online permit application portal for the Office of Water Resources (OWR) Groundwater and Freshwater Protection Programs. Applicants can now manage applications for Freshwater Wetlands, RIPDES Construction General Permit, Water Quality Certification, and Underground Injection Control Programs in this system. 

Phase Two Launch: OWTS/Septic

To deliver the best possible user experience, we are rolling out functionality for OWTS applications in two stages. Learn more: https://dem.ri.gov/owr-portal