Underground Storage Tank Management Program
Kevin Gillen, Supervisor
235 Promenade Street
Providence, RI 02908-5767
401-537-4326
fax 401-222-3813
The UST Management Program oversees the registration, modification, and closure of Underground Storage Tanks (UST program) as well as the cleanup of Leaking Underground Storage Tanks (LUST program).
UST Registration
Report Test Failure
USTs Prohibited From Receiving Deliveries ("Red Tagged")
UST Operator Certification Requirements
PUBLIC NOTICE
All federally regulated Single-walled Underground Storage Tanks and Product Pipelines must be removed and permanently closed prior to December 22, 2017 or 32 years from the date of installation, whichever is sooner. This does not apply to most heating oil USTs used for on-site use. View details and a list of facilities which contain single-walled components
Regulations
- Rules and Regulations for Underground Storage Facilities Used for Regulated Substances and Hazardous Materials (250-RICR-140-25-1) (eff. 11/20/18)
- Oil Pollution Control Regulations (250-RICR-140-25-2)
UST Operator, Ownership & Registration Forms
UST Registration Instructions and Application Form
PDF file, less than 1megabytes
Notification of Intent to Transfer UST Registration Form (Seller)
PDF file, less than 1megabytes
Change in Ownership of a UST or UST Facility Form
PDF file, less than 1megabytes
Change of UST Facility Operator Form
PDF file, less than 1megabytes
UST Testing Forms
Sump/UDC Vacuum Test Form
PDF file, less than 1megabytes
Hydrostatic Test Form
PDF file, less than 1megabytes
Annual UST Testing Forms
PDF file, about 1megabytes
Tank and Line Tightness Testing Form
PDF file, less than 1megabytes
Impressed Current Cathodic Protection Test Form
PDF file, less than 1megabytes
Sacrificial Anode Cathodic Protection Test Form
PDF file, less than 1megabytes
UST Repair & Installation Forms
Sump/UDC/SCB Repair Application
PDF file, less than 1megabytes
Spill Containment Basin Replacement Form
PDF file, less than 1megabytes
Application for the Repair or Modification of a UST System
PDF file, less than 1megabytes
Application for the Installation or Replacement of a UST
PDF file, less than 1megabytes
UST System Closure & Removal Forms
Permanent Closure Application for UST
PDF file, less than 1megabytes
Temporary Closure Application for UST
PDF file, less than 1megabytes
Guidelines for Closure of Underground Storage Tank Systems
PDF file, less than 1megabytes
Checklist for Guidelines for Closure of Underground Storage Tank Systems
PDF file, less than 1megabytes
Release Response During a UST Closure
PDF file, less than 1megabytes
Guidelines for Closure of Underground Storage Tank Systems
PDF file, less than 1megabytes
Checklist for Guidelines for Closure of Underground Storage Tank Systems
PDF file, less than 1megabytes
Closure in Place (CIP) Policy
PDF file, less than 1megabytes
Guidelines for Groundwater Monitoring Reports
PDF file, less than 1megabytes
Low-Level Hydrostatic Tightness Testing Eligibility Application
PDF file, less than 1megabytes
Low-Level Hydrostatic Tightness Testing Site Eligibility List
PDF file, less than 1megabytes
Individual Tightness Tester License Application
PDF file, less than 1megabytes
Company Tightness Tester License Application
PDF file, less than 1megabytes
Dri-Sump Test Method
PDF file, less than 1megabytes
Low-Level Hydrostatic Test Method
PDF file, less than 1megabytes
Licensed Tightness Testers
PDF file, less than 1megabytes
Tightness Tester Information and Requirements
PDF file, less than 1megabytes
Fact Sheet: Modification or Repairs to a UST System
PDF file, less than 1megabytes
UST Flood Guide
PDF file, about 3megabytes
Sump, Under-dispenser Containment, and Spill Containment Basin Testing Deadline
PDF file, less than 1megabytes
Repairing Sumps and Under-Dispenser Containment
PDF file, less than 1megabytes
Tightness Testing of Heating Oil USTs Deadline
PDF file, about 1megabytes
Residential Heating Oil UST Requirements
PDF file, about 1megabytes
Installation of Underground Storage Tanks
PDF file, less than 1megabytes
Single-Wall Closure Deadline
PDF file, less than 1megabytes