Official State of Rhode Island website

  • Change the visual color theme between light or dark modes
  • Adjust the font size from the system default to a larger size
  • Adjust the space between lines of text from the system default to a larger size
  • Adjust the space between words from the system default to a larger size

Fort Barton Elementary School

LID Type: Rain garden/ bioretention

Use: Institutional

Installer: H.V. Collins

Designer/Developer: Vanasse Hangen Brustlin Inc.

Install Date: 2008

Address: 99 Lawton Avenue

Town: Tiverton

Zip Code: 02878

County: Newport

Contact:

Jon Stabach

Vanasse Hangen Brustlin Inc.

401.272.8100

jstabach@vhb.com

Project Summary:

Bioretention areas and a rain garden were installed to reduce stormwater runoff from roads and parking areas and prevent impacts to nearby playing fields.

Project Narrative:

At the Fort Barton Elementary School a bioretention system was installed to collect  and treat runoff from entrance road drop-off/pickup areas, preventing direct flow and  impact to the nearby athletic fields. A rain garden located beside the parking lot was also installed. VHB provided preparation of the Rhode Island Pollutant Discharge Elimination System program.

pond surrounded by grass

Address: 99 Lawton Avenue, Tiverton, RI 02878