2010 Preconstruction Permits Note: This listing contains the versions of the minor source permit at the time of issuance. Some of these permits may have subsequently been modified or revised and therefore the document in this listing may not be the current version of the permit. If you need the current version of the permit, contact the Office of Air Resources. GTECH Corporation Providence Approval No. GPEG-55 Issued 12/28/10 Installation of a 217 HP emergency generator. Morgan Mill Metals, LLC Johnston Approval Nos. 2118-2120 Issued 12/28/10 Installation of a crucible, baghouse and incinerator for precious metals reclamation. Calise & Sons Bakery, Inc. Lincoln Approval No. 2117 Issued 12/22/10 Installation of a bread baking oven. Verizon New England Scituate Approval No. GPEG-53 Issued 12/8/10 Installation of a 126 HP emergency generator. The Narragansett Electric Company Warwick Approval No. GPEG-52 Issued 12/8/10 Installation of a 250 HP emergency generator. Verizon New England Providence Approval No. GPEG-51 Issued 12/2/10 Installation of a 2220 HP emergency generator. Fresenius Medical Care-North America Providence Approval No. GPEG-50 Issued 11/1/10 Installation of a 315 HP emergency generator. Level 3 Communications Providence Approval No. 2116 Issued 10/18/10 Installation of a 1502 HP emergency generator. Gorton-Menard Funeral Home Coventry Approval No. 2115 Issued 10/12/10 Installation of a human crematory. Citizens Bank of Rhode Island East Providence Approval Nos. GPEG-48 & 49 Issued 10/6/10 Installation of two 2937 HP emergency generators. Boston Scientific Corporation Coventry Approval No. 2114 Issued 9/30/10 Installation of ethylene oxide aeration cells. Aspen Aerogels, Inc. East Providence Approval Nos. 2111-2113 Issued 9/28/10 Installation of process equipment, a wet scrubber and a regenerative thermal oxidizer. Verizon New England East Providence Approval No. GPEG-47 Issued 9/23/10 Installation of a 904 HP emergency generator. Verizon Wireless Johnston Approval No. GPEG-46 Issued 9/14/10 Installation of a 107 HP emergency generator. Dept. of Administration, Pastore Center Cranston Approval Nos. 2109 & 2110 Issued 8/27/10 Installation of a 380 HP & a 316 HP emergency generator. Home & Hospice Care of RI Providence Approval No. GPEG-45 Issued 8/5/10 Installation of a 191 HP emergency generator. RI Air National Guard North Kingstown Approval No. GPEG-44 Issued 7/27/10 Installation of a 422 HP emergency generator. Verizon New England Woonsocket Approval No. GPEG-43 Issued 7/27/10 Installation of a 918 HP emergency generator. Brown University Providence Approval No. GPEG-42 Issued 7/27/10 Installation of a 402 HP emergency generator. MetroPCS Massachusetts Pawtucket Approval No. GPEG-54 Issued 7/22/10 Installation of a 127 HP emergency generators. Dept. of Administration, Pastore Center Cranston Approval No. GPEG-41 Issued 7/22/10 Installation of a 97 HP emergency generator. Calise & Sons Bakery, Inc. Lincoln Approval Nos. 2105-2108 Issued 7/6/10 Installation of three bread baking ovens and a catalytic oxidizer . Verizon Wireless Providence Approval No. GPEG-40 Issued 6/25/10 Installation of a 107 HP emergency generator. Verizon Wireless Narragansett Approval No. GPEG-39 Issued 6/22/10 Installation of a 93 HP emergency generator. Verizon Wireless Exeter Approval No. GPEG-38 Issued 6/22/10 Installation of a 107 HP emergency generator. Kenyon Industries, Inc. Kenyon Approval No. 2104 Issued 6/16/10 Installation of a carbon adsorber. RI Air National Guard North Kingstown Approval No. GPEG-37 Issued 6/15/10 Installation of a 384 HP emergency generator. Aspen Aerogels, Inc. East Providence Approval No. 2103 Issued 6/14/10 Installation of a temporary thermal oxidizer. Brown University Providence Approval No. TPFOB-5 Issued 6/7/10 Installation of a temporary 14.65 MMBTU/hr boiler. Brown University Providence Approval No. GPEG-36 Issued 6/4/10 Installation of a 337 HP emergency generator. Brown University Providence Approval No. GPEG-35 Issued 6/4/10 Installation of a 238 HP emergency generator. Block Island Power Co. Block Island Approval No. TPEG-2 Issued 5/27/10 Installation of a temporary 1500 HP emergency generator. Toray Plastics (America), Inc. North Kingstown Approval No. 2102 Issued 5/25/10 Installation of a temporary thermal oxidizer. Material Sampling Technologies, LLC North Smithfield Approval Nos. 2099-2101 Issued 4/7/10 Installation of three dust collectors. J.H. Lynch & Sons, Inc. Cumberland Approval Nos. 2097 & 2098 Issued 4/7/10 Installation of a baghouse and double barrel convertadrum. Advanced Chemical Company Warwick Approval No. 2096 Issued 3/26/10 Installation of a precious metals incinerator. The Narragansett Electric Company Warwick Approval No. GPEG-34 Issued 3/11/10 Installation of a 315 HP emergency generator. The Narragansett Electric Company Providence Approval No. 2095 Issued 3/11/10 Installation of a 209 HP emergency generator. Roger Williams Medical Center Providence Approval No. GPEG-33 Issued 3/5/10 Installation of a 1502 HP emergency generator. Verizon Wireless Coventry Approval No. GPEG-32 Issued 2/25/10 Installation of a 99 HP emergency generator. Admiral Packaging, Inc. Providence Approval No. 2094 Issued 2/12/10 Installation of an eight-color flexographic printing press. The Narragansett Electric Company Exeter Approval No. 2093 Issued 2/11/10 Installation of a 20.4 MMBTU/hr boiler. Naval Station Newport Newport Approval No. GPEG-31 Issued 2/2/10 Installation of a 364 HP emergency generator. Veterans Administration Medical Center Providence Approval Nos. 2091-2092 Issued 1/27/10 Installation of a 671 HP and a 755 HP emergency generator. FLO TV, Inc. Cumberland Approval Nos. 2090 Issued 1/19/10 Installation of a 99 HP emergency generator.